Spurlock Unit #4 Boiler & AQCS Project

Location: Maysville, KY

Owner: East Kentucky Power Cooperative

Contractor: Alstom / APComPower, Inc.

Date Completed: March 2009

Scope of Work

APi supplied and installed approximately 245,000 SF of insulation and lagging on a 300-MW Alstom CFB boiler, Alstom flash dryer absorber (FDA), Alstom fabric filter dust collector, air heater, fans, and the associated ductwork. In addition, APi installed over 12,000 LF of boiler piping.