

APi insulated Fabric Filter at Corn Products’ Argo Plant near Chicago, IL
Chesterfield Station #6 Baghouse Project
- LOCATION:
- Chester, VA
- CONTRACTOR:
- Alstom / APComPower
- OWNER:
- Dominion Power
- SCOPE OF WORK:
- Supply and installation of approximately 260,000 SF of insulation and lagging using API Type I Panels and a conventional duct top system on two (2) Hamon Research-Cottrell Fabric Filters and the associated ductwork
- DATE COMPLETED:
- April, 2008
Weston #4 Boiler & AQCS System
- LOCATION:
- Rothschild, WI
- CONTRACTOR:
- Babcock & Wilcox Construction Co.
- OWNER:
- Wisconsin Public Service
- SCOPE OF WORK:
- Supply and installation of 212,000 SF of conventional insulation on a 500 MW Supercritical Babcock & Wilcox (B&W) Boiler and two (2) B&W SCRs. In addition, installation of 230,000 SF of API Type I prefabricated panels on two (2) B&W Spray Dry Absorbers, one (1) B&W Fabric Filter, the associated ductwork, and an additional 20,000 LF of Insulation & Jacketing installed on the boiler piping
- DATE COMPLETED:
- March, 2008
San Juan Unit #3-4 Baghouse Project
- LOCATION:
- Waterflow, NM
- CONTRACTOR:
- Babcock & Wilcox Construction Co.
- OWNER:
- Public Service of New Mexico
- SCOPE OF WORK:
- Installation of 250,500 SF of Insulation & Lagging installed on two (2) Babcock & Wilcox Pulse Jet Fabric Filters and their associated ductwork using our API Type I Prefabricated Panels and conventional tops surfaces with roof deck
- DATE COMPLETED:
- March, 2008
J.P. Madgett Baghouse Project
- LOCATION:
- Alma, WI
- CONTRACTOR:
- Oscar J. Boldt Construction Company
- OWNER:
- Dairyland Power
- SCOPE OF WORK:
- Supply and installation of approximately 148,000 SF of Insulation & Lagging on a new Baghouse, enclosures, and associated ductwork using API Type I Prefabricated Panels
- DATE COMPLETED:
- November, 2007
Allan S. King Plant-2005 Fall Outage Transition Duct & MERP Project
- LOCATION:
- Bayport, MN
- CONTRACTOR:
- Xcel Energy
- OWNER:
- Xcel Energy Services, Inc.
- SCOPE OF WORK:
- Removal of approximately 74,000 SF of Insulation & Lagging for the rehabilitation of the existing Boiler and Turbine. In addition, supply and installation of approximately 605,000 SF & 23,000 LF of flatwork & piping Insulation associated with the addition of a Mitsubishi SCR, two (2) Alstom SDAs, two (2) Alstom Pulse Jet Fabric Filters, an Alstom 530MW Steam Turbine and a balance draft conversion of the existing Babcock & Wilcox Coal Fired Steam Generators
- DATE COMPLETED:
- September, 2007
Genoa #3 Baghouse
- LOCATION:
- Genoa, WI
- CONTRACTOR:
- Oscar J. Boldt Construction Company
- OWNER:
- Dairyland Power
- SCOPE OF WORK:
- Supply and installation of 158,000 SF of Insulation & Lagging on the Baghouse, enclosures, and associated ductwork
- DATE COMPLETED:
- June, 2007
Corn Products - Argo Plant #10 CFB Boiler & Scaffold
- LOCATION:
- Bedford Park, IL
- CONTRACTOR:
- ESI of Tennessee
- OWNER:
- Corn Products International
- SCOPE OF WORK:
- Supply and installation of Insulation & Lagging for 40,000 SF of API Prefabricated Panels, 114,000 SF of conventional insulation, 12000 LF of piping on a 100 MW Foster Wheeler Boiler, Ducts, Equipment & Wheelabrator baghouse
- DATE COMPLETED:
- December, 2006
Springerville Unit # 3
- LOCATION:
- Springerville, AZ
- CONTRACTOR:
- Bechtel Construction Company
- OWNER:
- Springerville Units Holding LLC
- SCOPE OF WORK:
- Supply and Installation of 140,000 SF of API Type I panel system, along with 264,000 SF of conventional installed Insulation & Lagging and 44,000 LF of piping associated with New Foster Wheeler Steam Generator, 450MW Mitsubishi Steam Turbine, Foster Wheeler SCR, two (2) Alstom Spray Dryer Absorbers and Alstom Fabric Filter Dust Collector
- DATE COMPLETED:
- July, 2006
Hardin Generation Station - Complete Coal Fired Boiler
- LOCATION:
- Hardin, MT
- CONTRACTOR:
- NewMech Companies, Inc.
- OWNER:
- Rocky Mountain Power, Inc.
- SCOPE OF WORK:
- Insulation & Lagging for a complete 113 MW Coal Fired Power Plant including one Babcock & Wilcox boiler, one Alstom SCR and one Hamon Baghouse, as well as all interconnecting ductwork, fans, air heaters, combustion air ductwork, piping and steam turbine. Completed scope included over 160,000 SF of conventional and panel insulation systems and over 20,000 lineal feet of piping.
- DATE COMPLETED:
- January, 2006
Manitowoc Unit # 9
- LOCATION:
- Manitowoc, WI
- CONTRACTOR:
- Oscar J. Boldt Construction Company
- OWNER:
- Manitowoc Public Utilities
- SCOPE OF WORK:
- Installation of 81,000 SF of Insulation & Lagging and 7,300 LF of Insulation & Jacketing associated with a 475,000 LB/HR Kvaerner Boiler & Environmental Elements including, a Wheelabrator Fabric Filter, Fans, and associated the piping
- DATE COMPLETED:
- October, 2005
Sun Coke Energy
- LOCATION:
- Franklin Furnace, OH
- CONTRACTOR:
- Kokosing Construction Company
- OWNER:
- Haverhill North Coke Company
- SCOPE OF WORK:
- Installation of 71,000 SF of Insulation & Lagging on an ALSTOM Baghouse, ALSTOM Scrubbers, and Enclosures
- DATE COMPLETED:
- June, 2005
Gilbert # 3 Boiler Project
- LOCATION:
- Maysville, KY
- CONTRACTOR:
- Alstom / AP Com Power
- OWNER:
- East Kentucky Power
- SCOPE OF WORK:
- Supply and Installation of 250,000 SF of Insulation & Lagging on a new ALSTOM 250 MW CFB boiler, the associated ductwork, fans, and an ALSTOM baghouse. Also installed 12,000 LF of Insulation & Jacketing on the boiler piping
- DATE COMPLETED:
- March, 2005
Marion Station CFB Boiler
- LOCATION:
- Marion, IL
- CONTRACTOR:
- Foster Wheeler Zack
- OWNER:
- Southern Illinois Power Cooperative
- SCOPE OF WORK:
- Installation of 130,000 SF of Insulation & Lagging on the Foster Wheeler 120MWBoiler and Fabric Filter, as well as 11,000 LF of Insulation & Jacketing on the balance of plant piping
- DATE COMPLETED:
- July, 2003
Olmsted County Waste to Energy Project
- LOCATION:
- Rochester, MN
- CONTRACTOR:
- Hamon Research Cottrell
- OWNER:
- Olmstead County Municipal Waste-to-Energy
- SCOPE OF WORK:
- Supply and installation of 25,000 SF of Insulation & Lagging on two (2) Hamon Research Cottrell Fabric Filters, two (2) Hamon Research Cottrell Scrubbers, and the associated ductwork and fans
- DATE COMPLETED:
- March, 2003
Gerald Gentlemen Station - Units #1 & #2
- LOCATION:
- Sutherland, NE
- CONTRACTOR:
- CE Integrated Services, Inc.
- OWNER:
- Nebraska Public Power District
- SCOPE OF WORK:
- Supply and installation of 400,000 SF of API Type I Panels on the ductwork and fans associated with three (3) WAPC Fabric Filters installed by others
- DATE COMPLETED:
- June, 2001
Pinellas County Resource Recovery Retrofit
- LOCATION:
- St. Petersburg, FL
- CONTRACTOR:
- WAPC - Wheelabrator Air Pollution Control
- OWNER:
- Pinellas County
- SCOPE OF WORK:
- Supply and installation of 150,000 SF of Insulation & Lagging associated with three (3) WAPC SDA-™s, three (3) WAPC Fabric Filters, the associated ductwork, and enclosures
- DATE COMPLETED:
- October, 2000
Massachusetts Refusetech APC Retrofit Project
- LOCATION:
- North Andover, MA
- CONTRACTOR:
- Whiting-Turner Contracting Company
- OWNER:
- Massachusetts Refusetech, Inc.
- SCOPE OF WORK:
- Supply and installation of Insulation & Lagging on two(2) Wheelabrator Spray Dry Absorbers and one (1) baghouse
- DATE COMPLETED:
- September, 2000
NSP - Red Wing Baghouse Project
- LOCATION:
- Red Wing, MN
- CONTRACTOR:
- Phillips Getschow Company
- OWNER:
- Northern States Power
- SCOPE OF WORK:
- Supply and installation of 35,000 SF of Insulation & Lagging associated with two (2) baghouses
- DATE COMPLETED:
- May, 2000
<< Back

APi Construction Company
800.223.4922
www.apiconst.com
APi consistently provides its products and services at competitive prices by proactively investigating new methods of project management and installation. With over 75 years of experience, APi is an industry leader and one of the top 10 privately held firms in the field.