Fabric Filter Projects
APi insulated Fabric Filter at Corn Products’ Argo Plant near Chicago, IL

 

Chesterfield Station #6 Baghouse Project

LOCATION:
Chester, VA
CONTRACTOR:
Alstom / APComPower
OWNER:
Dominion Power
SCOPE OF WORK:
Supply and installation of approximately 260,000 SF of insulation and lagging using API Type I Panels and a conventional duct top system on two (2) Hamon Research-Cottrell Fabric Filters and the associated ductwork
DATE COMPLETED:
April, 2008

Weston #4 Boiler & AQCS System

LOCATION:
Rothschild, WI
CONTRACTOR:
Babcock & Wilcox Construction Co.
OWNER:
Wisconsin Public Service
SCOPE OF WORK:
Supply and installation of 212,000 SF of conventional insulation on a 500 MW Supercritical Babcock & Wilcox (B&W) Boiler and two (2) B&W SCRs. In addition, installation of 230,000 SF of API Type I prefabricated panels on two (2) B&W Spray Dry Absorbers, one (1) B&W Fabric Filter, the associated ductwork, and an additional 20,000 LF of Insulation & Jacketing installed on the boiler piping
DATE COMPLETED:
March, 2008

San Juan Unit #3-4 Baghouse Project

LOCATION:
Waterflow, NM
CONTRACTOR:
Babcock & Wilcox Construction Co.
OWNER:
Public Service of New Mexico
SCOPE OF WORK:
Installation of 250,500 SF of Insulation & Lagging installed on two (2) Babcock & Wilcox Pulse Jet Fabric Filters and their associated ductwork using our API Type I Prefabricated Panels and conventional tops surfaces with roof deck
DATE COMPLETED:
March, 2008

J.P. Madgett Baghouse Project

LOCATION:
Alma, WI
CONTRACTOR:
Oscar J. Boldt Construction Company
OWNER:
Dairyland Power
SCOPE OF WORK:
Supply and installation of approximately 148,000 SF of Insulation & Lagging on a new Baghouse, enclosures, and associated ductwork using API Type I Prefabricated Panels
DATE COMPLETED:
November, 2007

Allan S. King Plant-2005 Fall Outage Transition Duct & MERP Project

LOCATION:
Bayport, MN
CONTRACTOR:
Xcel Energy
OWNER:
Xcel Energy Services, Inc.
SCOPE OF WORK:
Removal of approximately 74,000 SF of Insulation & Lagging for the rehabilitation of the existing Boiler and Turbine. In addition, supply and installation of approximately 605,000 SF & 23,000 LF of flatwork & piping Insulation associated with the addition of a Mitsubishi SCR, two (2) Alstom SDAs, two (2) Alstom Pulse Jet Fabric Filters, an Alstom 530MW Steam Turbine and a balance draft conversion of the existing Babcock & Wilcox Coal Fired Steam Generators
DATE COMPLETED:
September, 2007

Genoa #3 Baghouse

LOCATION:
Genoa, WI
CONTRACTOR:
Oscar J. Boldt Construction Company
OWNER:
Dairyland Power
SCOPE OF WORK:
Supply and installation of 158,000 SF of Insulation & Lagging on the Baghouse, enclosures, and associated ductwork
DATE COMPLETED:
June, 2007

Corn Products - Argo Plant #10 CFB Boiler & Scaffold

LOCATION:
Bedford Park, IL
CONTRACTOR:
ESI of Tennessee
OWNER:
Corn Products International
SCOPE OF WORK:
Supply and installation of Insulation & Lagging for 40,000 SF of API Prefabricated Panels, 114,000 SF of conventional insulation, 12000 LF of piping on a 100 MW Foster Wheeler Boiler, Ducts, Equipment & Wheelabrator baghouse
DATE COMPLETED:
December, 2006

Springerville Unit # 3

LOCATION:
Springerville, AZ
CONTRACTOR:
Bechtel Construction Company
OWNER:
Springerville Units Holding LLC
SCOPE OF WORK:
Supply and Installation of 140,000 SF of API Type I panel system, along with 264,000 SF of conventional installed Insulation & Lagging and 44,000 LF of piping associated with New Foster Wheeler Steam Generator, 450MW Mitsubishi Steam Turbine, Foster Wheeler SCR, two (2) Alstom Spray Dryer Absorbers and Alstom Fabric Filter Dust Collector
DATE COMPLETED:
July, 2006

Hardin Generation Station - Complete Coal Fired Boiler

LOCATION:
Hardin, MT
CONTRACTOR:
NewMech Companies, Inc.
OWNER:
Rocky Mountain Power, Inc.
SCOPE OF WORK:
Insulation & Lagging for a complete 113 MW Coal Fired Power Plant including one Babcock & Wilcox boiler, one Alstom SCR and one Hamon Baghouse, as well as all interconnecting ductwork, fans, air heaters, combustion air ductwork, piping and steam turbine. Completed scope included over 160,000 SF of conventional and panel insulation systems and over 20,000 lineal feet of piping.
DATE COMPLETED:
January, 2006

Manitowoc Unit # 9

LOCATION:
Manitowoc, WI
CONTRACTOR:
Oscar J. Boldt Construction Company
OWNER:
Manitowoc Public Utilities
SCOPE OF WORK:
Installation of 81,000 SF of Insulation & Lagging and 7,300 LF of Insulation & Jacketing associated with a 475,000 LB/HR Kvaerner Boiler & Environmental Elements including, a Wheelabrator Fabric Filter, Fans, and associated the piping
DATE COMPLETED:
October, 2005

Sun Coke Energy

LOCATION:
Franklin Furnace, OH
CONTRACTOR:
Kokosing Construction Company
OWNER:
Haverhill North Coke Company
SCOPE OF WORK:
Installation of 71,000 SF of Insulation & Lagging on an ALSTOM Baghouse, ALSTOM Scrubbers, and Enclosures
DATE COMPLETED:
June, 2005

Gilbert # 3 Boiler Project

LOCATION:
Maysville, KY
CONTRACTOR:
Alstom / AP Com Power
OWNER:
East Kentucky Power
SCOPE OF WORK:
Supply and Installation of 250,000 SF of Insulation & Lagging on a new ALSTOM 250 MW CFB boiler, the associated ductwork, fans, and an ALSTOM baghouse. Also installed 12,000 LF of Insulation & Jacketing on the boiler piping
DATE COMPLETED:
March, 2005

Marion Station CFB Boiler

LOCATION:
Marion, IL
CONTRACTOR:
Foster Wheeler Zack
OWNER:
Southern Illinois Power Cooperative
SCOPE OF WORK:
Installation of 130,000 SF of Insulation & Lagging on the Foster Wheeler 120MWBoiler and Fabric Filter, as well as 11,000 LF of Insulation & Jacketing on the balance of plant piping
DATE COMPLETED:
July, 2003

Olmsted County Waste to Energy Project

LOCATION:
Rochester, MN
CONTRACTOR:
Hamon Research Cottrell
OWNER:
Olmstead County Municipal Waste-to-Energy
SCOPE OF WORK:
Supply and installation of 25,000 SF of Insulation & Lagging on two (2) Hamon Research Cottrell Fabric Filters, two (2) Hamon Research Cottrell Scrubbers, and the associated ductwork and fans
DATE COMPLETED:
March, 2003

Gerald Gentlemen Station - Units #1 & #2

LOCATION:
Sutherland, NE
CONTRACTOR:
CE Integrated Services, Inc.
OWNER:
Nebraska Public Power District
SCOPE OF WORK:
Supply and installation of 400,000 SF of API Type I Panels on the ductwork and fans associated with three (3) WAPC Fabric Filters installed by others
DATE COMPLETED:
June, 2001

Pinellas County Resource Recovery Retrofit

LOCATION:
St. Petersburg, FL
CONTRACTOR:
WAPC - Wheelabrator Air Pollution Control
OWNER:
Pinellas County
SCOPE OF WORK:
Supply and installation of 150,000 SF of Insulation & Lagging associated with three (3) WAPC SDA-™s, three (3) WAPC Fabric Filters, the associated ductwork, and enclosures
DATE COMPLETED:
October, 2000

Massachusetts Refusetech APC Retrofit Project

LOCATION:
North Andover, MA
CONTRACTOR:
Whiting-Turner Contracting Company
OWNER:
Massachusetts Refusetech, Inc.
SCOPE OF WORK:
Supply and installation of Insulation & Lagging on two(2) Wheelabrator Spray Dry Absorbers and one (1) baghouse
DATE COMPLETED:
September, 2000

NSP - Red Wing Baghouse Project

LOCATION:
Red Wing, MN
CONTRACTOR:
Phillips Getschow Company
OWNER:
Northern States Power
SCOPE OF WORK:
Supply and installation of 35,000 SF of Insulation & Lagging associated with two (2) baghouses
DATE COMPLETED:
May, 2000