Coal Fired Boiler Projects
An enclosed boiler house at Manitowoc Unit #9 in Wisconsin

 

Weston #4 Boiler & AQCS System

LOCATION:
Rothschild, WI
CONTRACTOR:
Babcock & Wilcox Construction Co.
OWNER:
WI Public Service
SCOPE OF WORK:
Supply and installation of 212,000 SF of conventional insulation on a 500 MW Supercritical Babcock & Wilcox (B&W) Boiler and two (2) B&W SCRs. In addition, installation of 230,000 SF of API Type I prefabricated panels on two (2) B&W Spray Dry Absorbers, one (1) B&W Fabric Filter, the associated ductwork, and an additional 20,000 LF of Insulation & Jacketing installed on the boiler piping
DATE COMPLETED:
March, 2008

Council Bluffs Energy Center Unit # 4

LOCATION:
Council Bluffs, IA
CONTRACTOR:
Aker Kvaerner Songer
OWNER:
Mid American Energy
SCOPE OF WORK:
Supply and installation of all Insulation & Lagging required for a 790 MW Hitachi Supercritical Coal Fired Boiler, including 331,100 SF of conventional insulation applications on the boiler walls and ductwork, in addition to 80,350 LF of Insulation and Jacketing on the associated boiler piping
DATE COMPLETED:
February, 2008

Allan S. King Plant 2005 Fall Outage Transition Duct & MERP Project

LOCATION:
Bayport, MN
CONTRACTOR:
Xcel Energy
OWNER:
Xcel Energy Services, Inc.
SCOPE OF WORK:
Removal of approximately 74,000 SF of Insulation & Lagging for the rehabilitation of the existing Boiler and Turbine. In addition, supply and installation of approximately 605,000 SF & 23,000 LF of flatwork & piping Insulation associated with the addition of a Mitsubishi SCR, two (2) Alstom SDAs, two (2) Alstom Pulse Jet Fabric Filters, an Alstom 530MW Steam Turbine and a balance draft conversion of the existing Babcock & Wilcox Coal Fired Steam Generators
DATE COMPLETED:
September, 2007

Campbell Station Unit #3 Boiler Upgrade Project

LOCATION:
West Olive, MI
CONTRACTOR:
Alstom / APComPower
OWNER:
Consumers Energy
SCOPE OF WORK:
Removal of approximately 100,000 SF of existing non-asbestos insulation on an 820MW Coal Fired Boiler, and reinstallation of 120,000 SF of new Insulation & Lagging on the boiler and associated ductwork
DATE COMPLETED:
May, 2007

Corn Products - Argo Plant #10 CFB Boiler & Scaffold

LOCATION:
Bedford Park, IL
CONTRACTOR:
ESI of TN
OWNER:
Corn Products International
SCOPE OF WORK:
Supply and installation of Insulation & Lagging for 40,000 SF of API Prefabricated Panels, 114,000 SF of conventional insulation, 12000 LF of piping on a 100 MW Foster Wheeler Boiler, Ducts, Equipment & Wheelabrator baghouse
DATE COMPLETED:
December, 2006

Springerville Unit # 3

LOCATION:
Springerville, AZ
CONTRACTOR:
Bechtel Construction Company
OWNER:
Springerville Units Holding LLC
SCOPE OF WORK:
Supply and Installation of 140,000 SF of API Type I panel system, along with 264,000 SF of conventional installed Insulation & Lagging and 44,000 LF of piping associated with New Foster Wheeler Steam Generator, 450MW Mitsubishi Steam Turbine, Foster Wheeler SCR, two (2) Alstom Spray Dryer Absorbers and Alstom Fabric Filter Dust Collector
DATE COMPLETED:
July, 2006

Hardin Generation Station - Complete Coal Fired Boiler

LOCATION:
Hardin, MT
CONTRACTOR:
NewMech Companies, Inc.
OWNER:
Rocky Mountain Power, Inc.
SCOPE OF WORK:
Insulation & Lagging for a complete 113 MW Coal Fired Power Plant including one Babcock & Wilcox boiler, one Alstom SCR and one Hamon Baghouse, as well as all interconnecting ductwork, fans, air heaters, combustion air ductwork, piping and steam turbine. Completed scope included over 160,000 SF of conventional and panel insulation systems and over 20,000 lineal feet of piping.
DATE COMPLETED:
January, 2006

Manitowoc Unit # 9

LOCATION:
Manitowoc, WI
CONTRACTOR:
Oscar J. Boldt Construction Company
OWNER:
Manitowoc Public Utilities
SCOPE OF WORK:
Installation of 81,000 SF of Insulation & Lagging and 7,300 LF of Insulation & Jacketing associated with a 475,000 LB/HR Kvaerner Boiler & Environmental Elements including, a Wheelabrator Fabric Filter, Fans, and associated the piping
DATE COMPLETED:
October, 2005

Gilbert # 3 Boiler Project

LOCATION:
Maysville, KY
CONTRACTOR:
Alstom / AP Com Power
OWNER:
East KY Power
SCOPE OF WORK:
Supply and Installation of 250,000 SF of Insulation & Lagging on a new ALSTOM 250 MW CFB boiler, the associated ductwork, fans, and an ALSTOM baghouse. Also installed 12,000 LF of Insulation & Jacketing on the boiler piping
DATE COMPLETED:
March, 2005

Mobile Energy Boiler # 8 Rebuild

LOCATION:
Mobile, AL
CONTRACTOR:
AP Com Power - Alstom Power
OWNER:
Mobil Energy Services Company
SCOPE OF WORK:
Supply and installation of 34,000 SF of Insulation & Lagging to rebuild a Combustion Engineering Boiler
DATE COMPLETED:
June, 2004

Seward Repowering Project

LOCATION:
Seward, PA
CONTRACTOR:
Fluor Constructors International
OWNER:
Reliant Energy
SCOPE OF WORK:
Approx. 28,500 LF of pipe insulation and jacketing along with approx. 13,000 SF of insulation and lagging for miscellaneous associated equipment items
DATE COMPLETED:
March, 2004

Xcel Bayfront Units #1, 2 & 5 Abatement and Re-insulation Project

LOCATION:
Ashland, WI
CONTRACTOR:
Xcel Energy, Special Construction Services
OWNER:
Xcel Energy
SCOPE OF WORK:
The environmentally safe removal of asbestos insulation from Boilers #1, 2, 5 and associated piping, plus supply and re-installation of a more environmentally safe insulation and lagging system.
DATE COMPLETED:
November, 2003

Marion Station CFB Boiler

LOCATION:
Marion, IL
CONTRACTOR:
Foster Wheeler Zack
OWNER:
Southern IL Power Cooperative
SCOPE OF WORK:
Installation of 130,000 SF of Insulation & Lagging on the Foster Wheeler 120MWBoiler and Fabric Filter, as well as 11,000 LF of Insulation & Jacketing on the balance of plant piping
DATE COMPLETED:
July, 2003