One of four API insulated B&W Fabric Filters at San Juan Generating Station
Elm Road Units #1-2 Turnkey Project
- LOCATION:
- Oak Creek, Wisconsin
- CONTRACTOR:
- Bechtel
- OWNER:
- WE Energies
- SCOPE OF WORK:
- Supply and installation of nearly 950,000 SF of Insulation & Lagging on two (2) side-by-side Hitachi 625-MW Hitachi supercritical coal fired boilers, two (2) Hitachi steam turbines, two (2) Alstom Fabric Filter Dust Collectors, four (4) Howden in-line Induced Draft Fans, and other miscellaneous equipment. In addition, API is installing approximately 124,000 LF of Insulation and pipe jacketing on the Balance of Plant systems, boiler and turbine piping systems, and two (2) Alstom Wet Scrubbers
- SCHEDULED FINISH:
- Summer, 2010
Iatan Unit #2 Boiler
- LOCATION:
- Weston, Missouri
- CONTRACTOR:
- Alstom / APComPower, Inc.
- OWNER:
- Kansas City Power & Light
- SCOPE OF WORK:
- Supply and installation of approximately 452,000 SF of insulation & lagging on an 850-MW Alstom supercritical coal-fired boiler and the associated ductwork. In addition, API is installing approximately 13,600 LF of insulation and pipe jacketing on the boiler piping.
- SCHEDULED FINISH:
- March, 2010
Olmstead County Unit #3 Waste-to-Energy Plant
- LOCATION:
- Rochester, Minnesota
- CONTRACTOR:
- RHH
- OWNER:
- Olmstead County
- SCOPE OF WORK:
- Installation of approximately 28,000 SF and 12,700 LF of insulation & lagging on a waste-to-energy boiler, the associated ductwork, miscellaneous tanks & vessels, and the boiler piping.
- SCHEDULED FINISH:
- December, 2009
Brandon Shores Units #1-2 Baghouse Project
- LOCATION:
- Baltimore, Maryland
- CONTRACTOR:
- URS - Washington Division
- OWNER:
- Constellation Energy
- SCOPE OF WORK:
- Supply and installation of over 190,000 SF of insulation & lagging on two (2) Wheelabrator Pulse Jet Fabric Filters and the associated ductwork field joints. In addition, API will insulate four (4) Howden Booster Fans with the GOWA Acoustical Insulation system.
- SCHEDULED FINISH:
- November, 2009
Iatan Station Units #1 - 2 AQCS
- LOCATION:
- Weston, Missouri
- CONTRACTOR:
- Alstom / APComPower, Inc.
- OWNER:
- Kansas City Power & Light
- SCOPE OF WORK:
- Supply and installation of approximately 150,100 SF of API Type I Panels and 334,000 SF of conventional Insulation & Lagging on the Unit #1 SCR, Units #1 &2 Alstom Pulse Jet Fabric Filters, eight (8) I.D. Fans, and the associated ductwork
- SCHEDULED FINISH:
- September, 2009
Dallman Unit #4 Turnkey Project
- LOCATION:
- Springfield, Illinois
- CONTRACTOR:
- Kiewit / Black & Veatch (KBV)
- OWNER:
- City Water, Light & Power
- SCOPE OF WORK:
- Supply and installation of approximately 185,000 SF of Insulation & Lagging required for a new 230 MW Foster Wheeler Coal Fired Boiler, Wheelabrator Fabric Filter, Wheelabrator Wet Scrubber, and a Toshiba steam turbine. In addition, API is providing approximately 13,100 LF of Insulation & Jacketing associated with the Balance of Plant Piping for this project
- SCHEDULED FINISH:
- September, 2009
Monroe Units #3-4 Absorber Duct and Fans
- LOCATION:
- Monroe, Michigan
- CONTRACTOR:
- URS – Washington Division
- OWNER:
- DTE Energy
- SCOPE OF WORK:
- Supply and installation of approximately 30,000 SF of field joint, expansion joint, and damper insulation and lagging associated with a wet scrubber. API previously insulated the scrubber ductwork under a separate contract at an off-site location. In addition, API will install 18,000 SF of insulation and lagging over four (4) Howden Booster Fans with the GOWA Acoustical System.
- SCHEDULED FINISH:
- September, 2009
Clay Boswell Unit #3 AQCS Retrofit
- LOCATION:
- Cohasset, Minnesota
- CONTRACTOR:
- Jamar Company
- OWNER:
- Minnesota Power
- SCOPE OF WORK:
- Supply and installation of approximately 80,000 SF of conventional insulation and lagging on an SCR. Supply and installation of approximately 105,000 SF of API Type I Panels on the Fabric Filter, ID fans, and associated ductwork.
- SCHEDULED FINISH:
- September, 2009
Dunkirk Unit #3-4 Baghouse Project
- LOCATION:
- Dunkirk, New York
- CONTRACTOR:
- Clyde Bergemann, EEC
- OWNER:
- NRG Energy
- SCOPE OF WORK:
- Supply and installation of approximately 407,000 SF of Insulation & Lagging installed on four (4) Clyde Bergemann Fabric Filters, four (4) ID Fans, and the associated ductwork. In addition, API is installing approximately 75,000 SF of architectural siding on the four Fabric Filter Hopper Enclosures and penthouse enclosures.
- SCHEDULED FINISH:
- August, 2009
Comanche Unit #3 Boiler
- LOCATION:
- Pueblo, Colorado
- CONTRACTOR:
- Alstom / APComPower, Inc.
- OWNER:
- Xcel Energy
- SCOPE OF WORK:
- Supply and installation of approximately 325,00 SF of conventional Insulation & Lagging on a new Alstom 750-MW Supercritical coal fired boiler, fans, and associated ductwork. In addition, API is installing approximately 11,500 LF of Insulation & Jacketing on the boiler piping.
- SCHEDULED FINISH:
- July, 2009
Prairie State Unit #2 Boiler Ductwork
- LOCATION:
- Marissa, Illinois
- CONTRACTOR:
- Bechtel Power
- OWNER:
- Prairie State Generating Company
- SCOPE OF WORK:
- Supply and installation of 88,700 SF of insulation & lagging for the 850-MW Unit #2 Primary and Secondary Air duct. This work will be completed on the ground prior to the duct being installed in the boiler building.
- SCHEDULED FINISH:
- July, 2009
San Juan Unit #1-2 Baghouse Project
- LOCATION:
- Waterflow, New Mexico
- CONTRACTOR:
- Babcock & Wilcox Construction Co.
- OWNER:
- Public Service of New Mexico
- SCOPE OF WORK:
- Installation of 246,000 SF of Insulation & Lagging installed on two (2) Babcock & Wilcox Pulse Jet Fabric Filters and their associated ductwork using our API Type I Prefabricated Panels and conventional tops surfaces with roof deck
- SCHEDULED FINISH:
- April, 2009
Huntley Station #67-68 Baghouse Project
- LOCATION:
- Tonawanda, New York
- CONTRACTOR:
- Clyde Bergemann, EEC
- OWNER:
- NRG
- SCOPE OF WORK:
- Supply and installation of approximately 355,00 SF of Type I API Panels and conventional Insulation & Lagging on four (4) Clyde Bergemann fabric filters and the associated ductwork. In addition, API is installing approximately 78,000 SF of architectural siding on the four fabric filter hopper enclosures and penthouse enclosures.
- SCHEDULED FINISH:
- April, 2009
Brunner Island Units #1-3 FGD Ductwork & Fan Project
- LOCATION:
- Yorkhaven, Pennsylvania
- CONTRACTOR:
- Alstom / APComPower, Inc.
- OWNER:
- Pennsylvania Power and Light
- SCOPE OF WORK:
- Ground insulation of approximately 214,000 SF of ductwork & 17,000 SF of I.D. Fans. The insulation system is comprised of a 5" thick, double layer, API Type I prefabricated panel system for the ductwork & our 6" thick, double layer, TLT Babcock Sound Attenuation system for the I.D. Fans.
- SCHEDULED FINISH:
- April, 2009