identity
 
|<-
 
->|
 
project


Selective Catalytic Reduction (SCR) Projects
APi insulated Selective Catalytic Reduction (SCR) at Allen S. King Plant, Minnesota

 

Weston #4 Boiler & AQCS System

LOCATION:
Rothschild, WI
CONTRACTOR:
Babcock & Wilcox Construction Co.
OWNER:
Wisconsin Public Service
SCOPE OF WORK:
Supply and installation of 212,000 SF of conventional insulation on a 500 MW Supercritical Babcock & Wilcox (B&W) Boiler and two (2) B&W SCRs. In addition, installation of 230,000 SF of API Type I prefabricated panels on two (2) B&W Spray Dry Absorbers, one (1) B&W Fabric Filter, the associated ductwork, and an additional 20,000 LF of Insulation & Jacketing installed on the boiler piping
DATE COMPLETED:
March, 2008

Allan S. King Plant-2005 Fall Outage Transition Duct & MERP Project

LOCATION:
Bayport, MN
CONTRACTOR:
Xcel Energy
OWNER:
Xcel Energy Services, Inc.
SCOPE OF WORK:
Removal of approximately 74,000 SF of Insulation & Lagging for the rehabilitation of the existing Boiler and Turbine. In addition, supply and installation of approximately 605,000 SF & 23,000 LF of flatwork & piping Insulation associated with the addition of a Mitsubishi SCR, two (2) Alstom SDAs, two (2) Alstom Pulse Jet Fabric Filters, an Alstom 530MW Steam Turbine and a balance draft conversion of the existing Babcock & Wilcox Coal Fired Steam Generators
DATE COMPLETED:
September, 2007

Pleasant Prairie SCR & FGD Project

LOCATION:
Pleasant Prairie, WI
CONTRACTOR:
Washington Group
OWNER:
WE Energies
SCOPE OF WORK:
Supply and installation of 212,000 SF of Insulation & Lagging on the Unit #1 Babcock Power SCR, the FGD for Units #1 & 2, Booster Fans, and the associated ductwork
DATE COMPLETED:
April, 2007

Springerville Unit # 3

LOCATION:
Springerville, AZ
CONTRACTOR:
Bechtel Construction Company
OWNER:
Springerville Units Holding LLC
SCOPE OF WORK:
Supply and Installation of 140,000 SF of API Type I panel system, along with 264,000 SF of conventional installed Insulation & Lagging and 44,000 LF of piping associated with New Foster Wheeler Steam Generator, 450MW Mitsubishi Steam Turbine, Foster Wheeler SCR, two (2) Alstom Spray Dryer Absorbers and Alstom Fabric Filter Dust Collector
DATE COMPLETED:
July, 2006

Hardin Generation Station - Complete Coal Fired Boiler

LOCATION:
Hardin, MT
CONTRACTOR:
NewMech Companies, Inc.
OWNER:
Rocky Mountain Power, Inc.
SCOPE OF WORK:
Insulation & Lagging for a complete 113 MW Coal Fired Power Plant including one Babcock & Wilcox boiler, one Alstom SCR and one Hamon Baghouse, as well as all interconnecting ductwork, fans, air heaters, combustion air ductwork, piping and steam turbine. Completed scope included over 160,000 SF of conventional and panel insulation systems and over 20,000 lineal feet of piping.
DATE COMPLETED:
January, 2006

Harding Street Unit # 7 SCR Project

LOCATION:
Indianapolis, IN
CONTRACTOR:
Black & Veatch
OWNER:
AES/IPL - Indianapolis Power & Light Company
SCOPE OF WORK:
Installation of 60,000 SF of Insulation & Lagging on a Babcock & Wilcox SCR, the associated ductwork, and 6,000 LF of piping for Unit #7
DATE COMPLETED:
May, 2005

PSEG Mercer Units #1 & #2 SCR Project

LOCATION:
Hamilton, NJ
CONTRACTOR:
Lurgi Lentjes North America
OWNER:
PSEG - Public Service Electric & Gas
SCOPE OF WORK:
Supply and installation of 135,000 SF of Insulation & Lagging on two Lurgi SCR-s and associated ductwork
DATE COMPLETED:
June, 2004

Petersburg Units #2 - 3 SCR Project

LOCATION:
Petersburg, IN
CONTRACTOR:
Foster Wheeler Zack, Inc.
OWNER:
Indianapolis Power & Light Company / AES
SCOPE OF WORK:
Approx. 116,000 SF of API buried Z-bar conventional system application associated with 2 new Foster Wheeler SCR-s and associated ductwork; on-ground application with field joints installed after erection
DATE COMPLETED:
May, 2004

Bailly Station Unit 8 SCR Retrofit Project

LOCATION:
Chesterton, IN
CONTRACTOR:
Graycor Industrial Constructors, Inc.
OWNER:
NIPSCO
SCOPE OF WORK:
Supply and installation of 140,000 SF of Insulation & Lagging for a new SCR and the associated ductwork
DATE COMPLETED:
April, 2004

Kingston Fossil Plant, Units #1-4 SCR Project

LOCATION:
Harriman, TN
CONTRACTOR:
G UM BK
OWNER:
Tennessee Valley Authority
SCOPE OF WORK:
Installation of 130,000 SF of Insulation & Lagging for new ALSTOM SCRs and associated ductwork on Units #1, 2, 3, & 4
DATE COMPLETED:
April, 2004

Mt. Storm Unit #3 SCR Project

LOCATION:
Mt. Storm, WV
CONTRACTOR:
ALSTOM Power, Inc.
OWNER:
Virginia Electric Power Company
SCOPE OF WORK:
Supply and installation of 100,000 SF of Insulation & Lagging installed on a new ALSTOM SCR for Unit #3
DATE COMPLETED:
January, 2004

Monroe Unit #4 SCR and Ductwork Project

LOCATION:
Detroit, MI
CONTRACTOR:
Washington Group
OWNER:
Detroit Edison Company
SCOPE OF WORK:
Shop application and installation of 64,000 SF of Insulation & Lagging on the Unit #4 ductwork in addition to the field application on the Babcock Borsig SCR
DATE COMPLETED:
November, 2003

Duck Creek Station Unit #1 SCR Project

LOCATION:
Canton, IL
CONTRACTOR:
Lurgi Lentjes
OWNER:
AES Corporation
SCOPE OF WORK:
Furnish and install 28,000 SF of API Type I Prefabricated Panels and 100,000 SF of conventionally installed Insulation & Lagging on a new Lurgi SCR, the associated gas/air ducts, and air heater
DATE COMPLETED:
August, 2003

AES Edwards Station Unit #3 SCR Project

LOCATION:
Bartonville, IL
CONTRACTOR:
Lurgi Lentjes North America, Inc.
OWNER:
AES
SCOPE OF WORK:
Supply and installation of 56,000 SF of conventionally installed Insulation & Lagging on one new Lurgi SCR and associated gas/air ducts
DATE COMPLETED:
June, 2003

Spurlock Unit # 1 SCR Retrofit

LOCATION:
Maysville, KY
CONTRACTOR:
Alstom Integrated C-E Services
OWNER:
East Kentucky Power
SCOPE OF WORK:
Furnish and install approximately 317,000 SF of API Type I Panels and Conventional Application of Insulation & Lagging on an ALSTOM SCR, ALSTOM Precipitator, Air Heater and associated ductwork. Also approximately 27,000 SF of Metal Siding on the enclosures
DATE COMPLETED:
June, 2003

Chesterfield - Unit #4 SCR Project

LOCATION:
Chester, VA
CONTRACTOR:
ALSTOM Power, Inc.
OWNER:
Dominion Power
SCOPE OF WORK:
Supply and installation of 31,000 SF of conventionally installed Insulation & Lagging on one new ALSTOM SCR System, the associated gas/air ducts, and piping.
DATE COMPLETED:
May, 2003

Plant Bowen - Units #3 & #4 SCR Project

LOCATION:
Cartersville, GA
CONTRACTOR:
J.S. Alberici Construction Co., Inc.
OWNER:
Georgia Power Company
SCOPE OF WORK:
Removal of 162,000 SF of existing non-asbestos insulation, and re-installation of over 625,000 SF of Insulation & Lagging on four (4) Southern Company SCR-s, I.D. Fans, and associated ductwork-42,000 SF of 6- thick double layer conventional application of four (4) Bachman Damper Systems-186,000 SF of 9- thick double layer conventional application on four (4) Southern Company SCR-s-32,500 SF of 4- double layer API Type I Panels of eight (8) I.D. Fans-364,500 SF of 4- thick double layer API Type I Panels on existing and new ductwork
DATE COMPLETED:
May, 2003

Mt. Storm Power Station - Units 1 & 2 SCR Project

LOCATION:
Mt. Storm, WV
CONTRACTOR:
ALSTOM Power, Inc.
OWNER:
Virginia Electric and Power Company
SCOPE OF WORK:
Supply and installation of 400,000 SF of conventional Insulation & Lagging installed on four (4) Train SCR systems with four (4) new Air Heaters
DATE COMPLETED:
March, 2003