One of four API insulated B&W Fabric Filters at San Juan Generating Station

 

Elm Road Units #1-2 Turnkey Project

LOCATION:
Oak Creek, WI
CONTRACTOR:
Bechtel
OWNER:
WE Energies
SCOPE OF WORK:
Supply and installation of nearly 950,000 SF of Insulation & Lagging on two (2) side-by-side Hitachi 625-MW Hitachi supercritical coal fired boilers, two (2) Hitachi steam turbines, two (2) Alstom Fabric Filter Dust Collectors, four (4) Howden in-line Induced Draft Fans, and other miscellaneous equipment. In addition, API is installing approximately 124,000 LF of Insulation and pipe jacketing on the Balance of Plant systems, boiler and turbine piping systems, and two (2) Alstom Wet Scrubbers
SCHEDULED FINISH:
Summer, 2010

Dallman Unit #4 Turnkey Project

LOCATION:
Springfield, IL
CONTRACTOR:
Kiewit / Black & Veatch (KBV)
OWNER:
City Water, Light & Power
SCOPE OF WORK:
Supply and installation of approximately 185,000 SF of Insulation & Lagging required for a new 230 MW Foster Wheeler Coal Fired Boiler, Wheelabrator Fabric Filter, Wheelabrator Wet Scrubber, and a Toshiba steam turbine. In addition, API is providing approximately 13,100 LF of Insulation & Jacketing associated with the Balance of Plant Piping for this project
SCHEDULED FINISH:
October, 2009

Iatan Station Units #1 - 2 AQCS

LOCATION:
Weston, MO
CONTRACTOR:
Alstom / APComPower, Inc.
OWNER:
Kansas City Power & Light
SCOPE OF WORK:
Supply and installation of approximately 150,100 SF of API Type I Panels and 334,000 SF of conventional Insulation & Lagging on the Unit #1 SCR, Units #1 &2 Alstom Pulse Jet Fabric Filters, eight (8) I.D. Fans, and the associated ductwork
SCHEDULED FINISH:
September, 2009

San Juan Unit #1-2 Baghouse Project

LOCATION:
Waterflow, NM
CONTRACTOR:
Babcock & Wilcox Construction Co.
OWNER:
Public Service of New Mexico
SCOPE OF WORK:
Installation of 246,000 SF of Insulation & Lagging installed on two (2) Babcock & Wilcox Pulse Jet Fabric Filters and their associated ductwork using our API Type I Prefabricated Panels and conventional tops surfaces with roof deck
SCHEDULED FINISH:
March, 2009

Brunner Island Units #1-3 FGD Ductwork & Fan Project

LOCATION:
Yorkhaven, PA
CONTRACTOR:
Alstom / APComPower, Inc.
OWNER:
Pennsylvania Power and Light
SCOPE OF WORK:
Ground insulation of approximately 214,000 SF of ductwork & 17,000 SF of I.D. Fans. The insulation system is comprised of a 5" thick, double layer, API Type I prefabricated panel system for the ductwork & our 6" thick, double layer, TLT Babcock Sound Attenuation system for the I.D. Fans.
SCHEDULED FINISH:
February, 2009

Huntley Station Baghouse Project

LOCATION:
Tonawanda, NY
CONTRACTOR:
Clyde Bergemann, EEC
OWNER:
NRG
SCOPE OF WORK:
Supply and installation of approximately 355,00 SF of Type I API Panels and conventional Insulation & Lagging on four (4) Clyde Bergemann fabric filters and the associated ductwork. In addition, API is installing approximately 78,000 SF of architectural siding on the four fabric filter hopper enclosures and penthouse enclosures.
SCHEDULED FINISH:
January, 2009

Comanche Unit #3 Boiler

LOCATION:
Pueblo, CO
CONTRACTOR:
Alstom / APComPower, Inc.
OWNER:
Xcel Energy
SCOPE OF WORK:
Supply and installation of approximately 325,00 SF of conventional Insulation & Lagging on a new Alstom 750-MW Supercritical coal fired boiler, fans, and associated ductwork. In addition, API is installing approximately 11,500 LF of Insulation & Jacketing on the boiler piping.
SCHEDULED FINISH:
January, 2009

Comanche Units #1-3 AQCS

LOCATION:
Pueblo, CO
CONTRACTOR:
Babcock & Wilcox Construction Co.
OWNER:
Public Service Company of Colorado
SCOPE OF WORK:
Supply and installation of approximately 433,000 SF of APICC Type I Panels on seven (7) Babcock & Wilcox SDAs, two (2) B&W FFDCs, and their associated ductwork and fans. In addition, we are providing insulation and jacketing for 10,000 LF of pipe related to this work
SCHEDULED FINISH:
October, 2008

Comanche Units #1-3 Architectural Siding

LOCATION:
Pueblo, CO
CONTRACTOR:
Babcock & Wilcox Construction Co.
OWNER:
Public Service Company of Colorado
SCOPE OF WORK:
Supply and installation of approximately 189,700 SF of architectural siding on seven (7) SDA penthouse enclosures, two (2) Fabric Filter hopper enclosures and two (2) Fabric Filter penthouse enclosures
SCHEDULED FINISH:
October, 2008

Monroe Unit 3 & 4 FGD Ductwork Shop Insulation Project

LOCATION:
Onaway, MI (installation in Rogers City, MI)
CONTRACTOR:
Moran Ironworks
OWNER:
Detroit Edison
SCOPE OF WORK:
Shop installation of 77,000 SF of ductwork Insulation & Lagging to be associated with an FGD. The insulation system is comprised of one 2" thick single layer of fiberglass insulation against the plate with a 2" thick single layer API Type I prefabricated panel installed outside of the stiffeners.
SCHEDULED FINISH:
September, 2008

Spurlock #1 WFGD & WESP Project

LOCATION:
Maysville, KY
CONTRACTOR:
Alstom / APCom Power
OWNER:
East Kentucky Power
SCOPE OF WORK:
Supply and installation of approximately 20,000 SF of Insulation & Lagging on the ductwork associated with a Wet Flue Gas Desulphurization (WFGD) system. In addition, API is installing approximately 32,000 SF of a liner panel siding system over the Wet Electrostatic Precipitator (WESP) and various other buildings on site.
SCHEDULED FINISH:
August, 2008

USG Wallboard Manufacturing Facility, Kiln and Ductwork

LOCATION:
Washingtonville, PA
CONTRACTOR:
Jamar Company
OWNER:
Walbridge Aldinger
SCOPE OF WORK:
Supply and installation of approximately 66,000 SF of Insulation & lagging over the duct trains for Units 1-3 upstream and downstream of the fans. Installation is to be preformed on ground with in air tie-ins.
SCHEDULED FINISH:
June, 2008

Stuart Power Plant & Killen Station

LOCATION:
Aberdeen & Manchester, OH
CONTRACTOR:
Black & Veatch
OWNER:
Dayton Power & Light
SCOPE OF WORK:
Installation of 186,000 SF of a conventional Insulation & Lagging system on the in-place ductwork, tie-ins associated with shop-insulated ductwork, ten (10) large Boosfter Fans, and eight (8) large Induced Draft Fans. The scope also includes heat tracing and Insulation & Jacketing on over 51,000 LF of piping
SCHEDULED FINISH:
May, 2008

Montour #1-2 FGD Ductwork

LOCATION:
Washingtonville, PA
CONTRACTOR:
Alstom / APComPower
OWNER:
Pennsylvania Power & Light Corporation
SCOPE OF WORK:
Installation of Insulation & Lagging on the ductwork associated with an FGD to include 207,000 SF of on-ground installation and 36,500 SF of in-air tie-in work associated with the project. In addition, installation of approximately 19,000 SF of insulation and lagging on four (4) Howden I.D. Booster Fans
SCHEDULED FINISH:
May, 2008

High Bridge 500-MW Combined Cycle Power Plant

LOCATION:
St. Paul, MN
CONTRACTOR:
Lockwood Greene Constructors
OWNER:
Xcel Energy
SCOPE OF WORK:
Supply and installation of approximately 50,000 SF of Insulation & Lagging on two (2) Nooter-Eriksen Heat Recovery Steam Generators (HRSG-™s) and combined cycle stacks. In addition, API is installing approximately 44,000 LF of Insulation & Jacketing associated with two (2) Mitsubishi F-class Combustion Turbines, one (1) Mitsubishi Steam Turbine, and the balance of plant piping
SCHEDULED FINISH:
April, 2008

Spurlock #2 WFGD & WESP Project

LOCATION:
Maysville, KY
CONTRACTOR:
Alstom / APCom Power
OWNER:
East Kentucky Power
SCOPE OF WORK:
Supply and installation of approximately 32,000 SF of Insulation & Lagging on the I.D Fans and ductwork associated with a Wet Flue Gas Desulphurization system. In addition, API is installing approximately 108,000 SF of a liner panel siding system associated with two Wet Electrostatic Precipitators and various other buildings on site.
SCHEDULED FINISH:
April, 2008