Coast-to-Coast Capabilities

Coast-to-Coast Capabilities

Xcel Sherco Pier Dam Replacement #3 Boiler

Xcel Sherco Pier Dam Replacement #3 Boiler

Project Location: Becker, MN Office

Owner: Xcel Energy

Contractor: Boldt Construction

Formed and poured refractory pier dam (94.5’ long x 2.5’ high, x 25” thick) and skim coated the penthouse roof tubes and poured the penthouse penetration boxes.  

Material Used:  Lougun 26 LI, US 60 LC, WB Anchors, SS Needles, 2” Block insulation.